59 R E L A S T ® D E S I G N M A N U A L MTV event hall Munich Problem Restoration reason In the course of renovation work it was found that the existing shear reinforcement was severely corroded and therefore the shear loadbearing capacity was no longer sufficient Amethod was developed for the listed building to invisibly reinforce the cantilever arms of the gallery Solution With the help of the RELAST ® system a postinstalled shear reinforcement was achieved So that the reinforcement is invisible 113 RELAST ® composite anchor bolts 16 x 320 mm to 16 x 570 mm were installed into the cantilever arms from above The overhang of the RELAST ® screws 47 mm is covered by the floor structure and is ultimately no longer visible Special features of the project • Construction work was only possible from the top • Invisible reinforcement measure due to Monument protection